Another step forward in closing the gap!

Big surprise this morning on our Wednesday morning hike, when Midland Ganaraska Hiking Club president Larry Piitz had the notion that we should hike in the Thompson Forest leading to the Tiny Trail (also called Bridges Trail and part of the Trans Canada Trail). Good thing we did as we discovered the beautiful set of stairs built by Tiny Township at our request and leading from the top of the cliff down to the Tiny Trail. 39 steps!!! 

This will become part of the Ganaraska Hiking Trail, as we close the gap between the Midland and Tiny sections of the trail…. hopefully before year end. Just some minor loose ends still to get approved. 

This will add another 16 km approximately to the Midland section of the Ganaraska Hiking Trail.  

2023.04.28 – Notice of Non-Maintained Section on GHTA Mad River Trail

The section of the GHTA trail from the junction of the railway line and Brentwood Road (44.35386, -79.96300) to the junction Concession 3 and the railway tracks (44.35384, -7996378) follows an abandoned railway line.  Railway ties and considerably overgrowth of shrubs tangled with vines makes numerous sections of this portion of trail very difficult to hike.

Maintenance of this section of trail is planned for the future, with the County of Simcoe considering transformation of the abandoned railway line into a multi-use trail (hopefully in the not-too distant future).

This trail section remains open for use, but the Mad River team wants hikers to be aware of the difficult hiking conditions.

Fallen Trees in Ganaraska Forest

In the Pine Ridge section of the Ganaraska Hiking Trail, between km 31 and km 39 in the Ganaraska Forest, there still are a number of fallen trees due to storm damage. Ganaraska Regional Forest staff will be clearing this area in the near future. Until that happens, Ganaraska Hiking Trail volunteers are not allowed to do regular trail maintenance and refresh the blazes, which may cause some confusion with navigating the Ganaraska Hiking Trail in that part of the Ganaraska Forest.

Ganaraska Forest (Central)

The section of the GHTA trail from km 31.1 to 39.7 will not be open to hikers until April 1st. Until then hikers must use the bypass trail west along the 10th line of Hope Township from km 31.1 to the Cold Springs Camp Road and then north on the Cold Springs Camp Road to the point where it joins the GHTA trial at km 39.7.  The bypass is marked with blue blazes.  Only hikers on a GHTA club-sanctioned hike or GF members are permitted to use the GF trails without paying a day-use fee.  The only place to purchase a day pass is at the GF Centre.  It is planned to have day-use permits available online by April 1st.  

2023.03.15 – Logging Operation Affects Orillia Trail (2023.07.28 Update – Logging Operations Completed and trail can be used.)

Logging has started in the Simcoe County Forest Rathburn tract east of Orillia. As a result, a small section of the Orillia trail is temporarily unavailable for use. It is very important to obey, at all times, the county signs indicating areas that are off limits for hiking. The attached map shows the affected location. An update notice will be posted when we receive notification that logging has been completed and the signs removed.

2023.03.23 Update – Logging Operation Affecting Barrie Trail Completed

2023.03.23 Update – Logging has been completed so this section is now open for use. Trail maintenance to clear the trails of any debris from the logging operation is yet to be done, so be careful if hiking through this section in the near future.

2023.02.10 Original Post: There is currently an active logging operation in Simcoe County Forest that affects the Barrie trail east of Gill Road (the Orrock Creek South tract). Please avoid this section of the trail and stay out of the areas indicated by the county signage in the forest. An update to this notice will be posted when logging is completed.

2022.11.29 – Barrie Main Trail Re-route south of Baldwick Lane near Minesing Wetlands

A section of the Barrie main trail near the Minesing Wetlands runs across property owned by the Nature Conservancy of Canada (NCC). We have just finished working with NCC representatives to reroute our trail on their property to avoid foot traffic on some ecologically sensitive areas and also to avoid some areas where the invasive garlic mustard has been found. If you are hiking southbound from Baldwick Lane the trail changes when you come to the first stile. Previously you would have gone right (west) across the open field but now you veer slightly left. The new trail is actually quite nice, going through cedar forest, over some small streams, and along a ridge providing great views of the open fields looking towards Minesing Wetlands. The new trail is fully blazed and ready to use. It is very important to stay on the trail through this section as garlic mustard can be found close to the trail and it is important not to spread it by carrying seeds on your boots. Both Ondago and our website downloadable maps will be updated in the near future.