2026.04.04 – Bridge Construction Affects Midland Trail Posted on April 4, 2026 by John Sloan The pedestrian bridge over the Wye River in Midland is closed for construction until end of May (W3W = contracting.sprees.segment / coordinates = 44.73554, -79.84553). A reroute will be posted in the next few days.